Bid deadline extended for Durrat al-Bahrain-Hawar dual-carriageway

19 September 2003

The bid deadline has been extended by one month to 14 October for the contract to build a dual-carriageway linking the Durrat al-Bahrain resort development to the Hawar highway. The client is the Ministry of Works.

Prospective bidders are understood to include Ahmed Mansour A’Ali (AMA) and AA Nass, both local, Belgium’s Six Constuct,Cyprus-basedGP Zachariades , Abu Dhabi-basedAl-Jaber Establishment,Dubai-based Wade Adams Contracting and Saudi Arabia’s Nasser Hassan.

The contract, valued at about BD 20 million ($52.6 million), entails the construction of a 25-kilometre stretch of dual-carriageway, five grade-separated interchanges and associated three-span flyovers. The contract duration is 24 months. A team of the local Ismael Khonji Associates and the UK’s High Point Rendel is the consultant (MEED 30:8:02).

The Durrat al-Bahrain resort is scheduled for completion in 2008 and will include a water park, a golf course, a marina, a shopping mall, an international exhibition centre, two hotels and residential units. The water park is under construction while start-up on the remainder of the infrastructure awaits the completion of reclamation work, which is being carried out by a team of Saudi Archirodon with Royal Boskalis Westminsterof the Netherlands.

A MEED Subscription...

Subscribe or upgrade your current MEED.com package to support your strategic planning with the MENA region’s best source of business information. Proceed to our online shop below to find out more about the features in each package.