Tender due to be issued after Kuwait Oil Company approval
UK-based consultancy Amec Foster Wheeler has completed front-end engineering design (feed) for Gathering Centre 32, a project commissioned by upstream operator, Kuwait Oil Companys (KOC), to deal with increasing crude sourness from the Burgan field, the worlds largest sandstone oil field.
The project is now awaiting KOC approval and is expected to be tendered within two months.
You might also like...
UAE builds its downstream and chemicals potential
24 April 2024
Acwa Power eyes selective asset sales
24 April 2024
Bahrain mall to install solar carport
24 April 2024
Aramco extends Karan field bid deadline
24 April 2024
A MEED Subscription...
Subscribe or upgrade your current MEED.com package to support your strategic planning with the MENA region’s best source of business information. Proceed to our online shop below to find out more about the features in each package.