The works involve the construction of 17 buildings, which will be 20-floors high.
They will have a built-up area of 440,000 square metres, along with a four-level podium with a built-up area of 240,000 sq m.
The other bidders were Dhabi Contracting, Al-Faraa Group and United Engineering Construction (Unec), all local.
The package is the latest to be developed at Building Material City.
The local/French joint venture of Fibrex and Thinet Emirates was recently given notice to proceed on the infrastructure and roads construction package.
The same joint venture is already working on the first phase of the building works that involves the construction of a mall covering 100,000 sq m and two office towers.
CRSS International, part of the US' Jacobs Group, is the project manager (MEED 7:8:08).
You might also like...
European finance in place for Tunisia Bizerte bridge
29 March 2024
HZI takes on Dhafra waste energy EPC contract
29 March 2024
Policy designates Masdar, Adnoc as hydrogen coinvestors
29 March 2024
Waste energy projects find relevance
29 March 2024
A MEED Subscription...
Subscribe or upgrade your current MEED.com package to support your strategic planning with the MENA region’s best source of business information. Proceed to our online shop below to find out more about the features in each package.