Over $17bn worth of contracts were awarded across the Middle East region in July, according to this selected checklist compiled from MEED reports throughout the month.

For more up to date information on the region’s largest projects, go to www.meedprojects.com, which tracks $2 trillion worth of projects.

ProjectContractorClientEstimated Value ($m)Date
Algeria
Construction of a 1,000 cubic metres a day (cm/d) crude processing unit and a compression station with capacity of 8 million cm/d at the Rhourde Nouss field in the southeast of Algeria.Japan’s JGC CorporationSonatrach47010/7/2008
Build the new 4.7-million-tonne-a-year liquefied natural gas (LNG) plant at Arzew.Snamprogetti (Italy) with Chiyoda Corporation (Japan)Sonatrach4,50013/7/2008
Egypt
Manage nine projects for TMG.Joint venture between Hill International (US) and Talaat Moustafa Group Holding (TMG) (Egypt)Talaat Moustafa Group Holding (TMG)na23/7/2008
Kuwait
Build a conference at Bayan Palace in Kuwait.Al-Hani Construction & Trading CompanyMinistry of Public Works1057/7/2008
Build a health centre at Bayan Palace.Al-AmiahMinistry of Public Works53.57/7/2008
Gather 3D seismic data on Kuwaiti onshore oil and gas fields to determine the potential for hydrocarbons discoveries in the state’s existing and undiscovered fields.WesternGecoKuwait Oil Company (KOC)8316/7/2008
Build a 300/132/11KV substation at Jaber al-Ahmed in KuwaitHyundai Engineering & Construction (South Korea)Ministry of Electricity & Water92.129/7/2008
Libya
Construction of public service networks for gas, drinking water, phone services and pavements in Benghazi and El Beida, both on the coast.Sacyr Vallehermoso (Spain)SV Ledico (60 per cent owned by Sacyr and 40 per cent owned by the Libyan government)95714/7/2008
Oman
Construction of an international maritime college in Sohar.Al-Qasim Trading & ContractingMinistry of Manpower359/7/2008
Qatar
Design and build the new Ras Laffan Emergency & Safety College.Black Cat Engineering & Construction and SEG QatarQatar Petroleum, Texas A&M University and the Qatar Foundation for Education, Science & Community Development30221/7/2008
Phase 8 expansion and development of Qatar’s electricity transmission network.Nexans (France)Qatar General Electricity & Water Corporation (Kahramaa)9223/7/2008
Design contract for a new gas sweetening unit at Dukhan. The unit will have capacity to process about 450 million cubic feet a day (cf/d) of gas from the Khuff reservoirTechnip (France)Qatar Petroleum (QP)6.728/7/2008
Monitoring contract for work on Qatar Petroleum’s sites and facilities. Carry out compliance testing of the incinerator facility at Halul island, which houses a number of QP’s giant crude oil storage tanksSGS QatarQatar Petroleum (QP)na30/7/2008
Saudi Arabia
Design, supply, install and commission a 1,200MW thermal power plant next to the existing Shuaiba power plant, 100 kilometres south of Jeddah.Alstom (France)Saudi Electricity Company3,0003/7/2008
Modification of boilers at the Ghazlan power plant to increase its overall power generating capacity.Raymond International Group and Alstom (France)Saudi Electricity Company1507/7/2008
Supply and apply corrosion-resistant linings and coatings on more than 1,000 kilometres of steel water pipelines.Raymond International GroupSaline Water Conversion Corporation
Install a large-diameter glass-reinforced plastic pipeline as part of the National ChevronPhillips petrochemicals complex in Jubail.Raymond International GroupSaudi Polymers Company
Design and engineering of a range of buildings within Jubail.Saudi Consulting ServicesRoyal Commission for Jubail and Yanbu1113/7/2008
Construction of 16 buildings at King Khaled University.Guangdong Overseas Construction Group (China)Ministry of Higher Education61213/7/2008
Construction of a 380-kV substation in Al-Qassim province.Siemens (Germany)Saudi Electricity Company (SEC)19118/7/2008
Build a fuel-oil pipeline connecting the existing network with the existing Al-Qassim power plant.Gulf Consolidated Contractors (local)132
Construction of five smaller substations close to Riyadh.Al-Osais Contracting Company (local)119
Reinforce and upgrade the Wadi al-Dawasir power plant in the south of the Nejd region.Al-Toukhi Contracting (local)163.7
Construction of 134 villas in King Abdullah Economic City (KAEC).Al-Redwan (local)Emaar The Economic City (EEC)9923/7/2008
Dredging and excavation for a waterfront development at Yanbu on the Red Sea coast.China Harbour Engineering CompanyRoyal Commission for Jubail & Yanbu10024/7/2008
Increase the capacity of the plaster plant at Yanbu by 240,000 tonnes a year (t/y) to 390,000 t/y. Carry out the engineering and construction work, and install a multi-million-dollar gypsum calcining system to produce stucco, as part of a new wallboard lineClaudius Peters Technologies (Germany)Saudi Mada Gypsum Companyna28/7/2008
Tunisia
Build a 400M272W combined cycle power plant at Ghannouch in southern Tunisia.Alstom (France)Societe Tunisienne de l’Electricite et du Gaz (Steg)5291/7/2008
UAE
Build 300 villas and terrace homes at the Al-Furjan development in the Jebel Ali area.Al-Shafar Transport and Contracting Company (local)Nakheel1631/7/2008
Build the Summit tower project at Dubai Media City. The contract involves the construction of a 30-floor commercial building. The total built-up area is about 100,000 square metres.ETA AsconETA Star1328/7/2008
Build 462 villas at Jumeirah Park in Dubai.Nurol Group (Turkey)Nakheel2728/7/2008
Produce and process more than 1 billion cubic feet of sour gas from Abu Dhabi’s onshore Shah field.Joint venture between Abu Dhabi National Oil Company (Adnoc) and ConocoPhillips (US)1,0008/7/2008
Installation of gas distribution pipelines at Yas island. Work involves laying 15-20 kilometres of pipes to provide gas to the planned Formula One race track on the island. It also includes pressure-reducing stations and desulphurisation facilities.Joint venture betweeb Lootah BC Gas (local) and QEnergyAldar Properties20.49/7/2008
Conversion of existing gas pipelines to carry liquefied petroleum gas (LPG). The contract, known as NGD-7, also calls for the connection of the LPG pipelines to local petrol stations.Adnoc Distribution and Abu Dhabi Gas Industries Company (Gasco)19.6
Enabling works contract for the Arena Mall shopping centre at Dubai Sports City (DSC). Work involves site preparation, shoring works and the excavation of 1.1 million cubic metres of material for a three-level parking basement with 7,000 spaces.NSCCDubai Sports Cityna10/7/2008
Construction of 1,504 villas and townhouses, a hotel, hotel apartment building, shopping mall, hospital, health club, two mosques, and a school on over 400,000 square metres of land in Ajman.Sweet Homes General ContractingSweet Homes (local)60013/7/2008
Dredging 86 million cubic metres of sand to form 540 hectares of new land, and the construction of a breakwater and shore protection at Nakheel’s Port Rashid development.Joint venture between Dredging International(Belguim) and Royal Boskalis Westminster (Netherlands)Nakheel60013/7/2008
Construction of five 17-storey towers above a five-level carpark and includes a hotel, office tower, serviced apartments and retail and food outlets at the Al-Bustan development in Abu Dhabi.Al-Habtoor Engineering Enterprises (local)Al-Hamid Group (local)61314/7/2008
Full mechanical, electrical and plumbing (MEP) contract for two sites on Yas Island: Rotana Resort and Centro by Rotana.Drake & Scull InternationalAldar Properties3414/7/2008
Enabling works for the 98-storey Damac Heights project in Dubai Marina.Zetas Foundation TechnologyDamac Properties1315/7/2008
Construction of four bridges and five kilometres of elevated roadways connecting the island to Abu Dhabi Island and Reem Island.Al-Naboodah Construction GroupMubadala Real Estate & Hospitalityna20/7/2008
Construction of two 26-storey buildings covering an area of 85,000 square metres in Dubai Sports City. The buildings will feature one, two and three-bedroom apartments, a swimming pool and health spa.Ranya Group (local)Chapal World (local)10021/7/2008
Construction of two multi-level interchanges to replace two roundabouts in the Al-Quoz area.Gunal Construction Company (Turkey)Roads & Transport Authority (RTA) (local)231.921/7/2008
Upgrade the road between the Umm Suqeim junction up to the junction of Emirates road, widening the road and constructing two flyovers.ETA Ascon Group119.2
Design and build the planned 240-kilometre-long, 48-inch-diameter gas pipeline between Taweelah in Abu Dhabi and Qidfa in Fujairah.Stroytransgaz (Russia)Dolphin Energy41823/7/2008
Construction of the Silverene Towers - one with 44 storeys, the other with 38. They will share a common four-storey retail podium.Arabtec Construction (local)Cayan Investment & Development (Saudi Arabia)17424/7/2008
Build the Lakeside development at the International Media production Zone (IMPZ). Construction of four towers, two with 21 storeys and two with 22 levels.Intermass Engineering & Contracting Company (local)Damac Properties21927//7/2008
Construction of the Masdar Institute of Science and Technology, which has been planned as the world’s first graduate university dedicated to renewable energyAl-Ahmadiah Hip Hing (Local/Hong Kong joint venture)Masdar Cityna28//7/2008
Earthmoving work for the Escape project in AjmanKazarooni Contracting CompanyEscape, LLCna28//7/2008
The contract covers the financing, concept, construction and operation of two new wastewater plants in Abu Dhabi and Al AinBesix (The Netherlands) and Veolia (France)Abu Dhabi Water & Electricity Authority82430//7/2008
Supply equipment (gas turbines, steam turbines, heat recovery steam generators and condensers) to the captive power plant at the Emirates Aluminium (Emal) production facility near Al-Taweelah in Abu DhabiGE (US)Emirates Aluminium (Emal)50030//7/2008
Total17,856.1

MEED Projects, tracking $2 trillion worth of projects, is a subscriber-only service that provides comprehensive, up-to-date and accurate project information. Monitor industry and business development opportunities through market data tailored to your needs.

Be the first to know about new projects; we provide the data so you can win the business.

If you would like to see a demo of MEED Projects, or just want to find out more, register your details on meedprojects.com or call +971 (0)4 367 1302.

A MEED Subscription...

Subscribe or upgrade your current MEED.com package to support your strategic planning with the MENA region’s best source of business information. Proceed to our online shop below to find out more about the features in each package.