The scope of works involves adding 7 million gallons a day (g/d) to the plant’s existing nameplate capacity of 10 million g/d. The plant – built by Sasakura in the early 1980s – has boosted its output over the last six months to a maximum of 12 million g/d of water in order to meet rising local demand. Kuljian Engineering Corporation of the USis the consultant.