Iraq: Bridge rehabilitation (1)

26 November 2021
Rehabilitation of a bridge
  • Description: Rehabilitation of the Maktab Khald bridge in Kirkuk Governorate as part of the emergency operation development project. The project comprises the rehabilitation of all items of the project including, but not limited to, the following: 1) construction of a temporary traffic detour to change the course of the traffic during rehabilitation works (the length of the detour will be 1,700 metres, requires spreading gravel aggregate and 10 centimetres of asphalt; 2) provision of equipment necessary to lift the soil earth, soil fill, demolition and removing of all parts of superstructure for spans (S1, S2) including deck slab, asphalt wearing, sidewalk damaged girder,…etc. and releasing undamaged girders after doing structural evaluation, and all incidentals by a method that keeps the structure safe then lifting and transporting concrete rubbles from the project site to a suitable construction waste disposal area; 3) demolition and removal of all parts of abutment (A1), and pier (P1) and piles after doing structural evaluation and safety test for piles; 4) casting reinforced concrete type D20 for abutment A1and Pier P1, if needed; 5) casting concrete type D20 for abutment A1 and Pier P1; 6) placing reinforced elastomeric bearings, provision, transportation and placing reinforced concrete girders (pre-cast pre-stress); 7) casting reinforced concrete for deck slab, diaphragm and sidewalks; and 8) spreading hot polymer modified asphalt wearing course, provision and replacement of expansion joints, installation of hand rails and turning on lighting for the bridge. The foreseen construction period is 240 days
  • Closing date: 15 December 2021
  • Finance: World Bank
  • Tender no.: Project ID P155732. Notice no. OP00155247. Loan no. IQ-87930
  • Cost of tender documents: ID250,000
  • Miscellaneous: A pre-bid meeting will be held on 8 December. The cost estimate of the project is $1.11m
  • Client: Construction & Housing & Municipalities & Public Works Ministry
  • Address: Roads & Bridges Directorate, Seventh Floor, Hussain Jasim Kazim, Director General, PMT Leader, Project Management Team, Karadat Mariam, Baghdad
  • Phone: (964) 7902333137
  • Email: eng.hussainjasim@gmail.com, iodpproject@gmail.com