Saudi Arabia: Power plant boiler drain and waste piping

18 March 2010

Design, construction and commissioning of an underground boiler drain and oily waste piping at a power plant. Closing date: 30 March 2010

Become a MEED subscriber for unlimited access to:

Alternatively Login to your account

A MEED Subscription...

Subscribe or upgrade your current MEED.com package to support your strategic planning with the MENA region’s best source of business information. Proceed to our online shop below to find out more about the features in each package.