TURKEY Tunnel works

13 November 1998
NEWS

Details of the tender may be obtained from State Hydraulics Works (Devlet Su Isleri Genel Mudurlugu - DSI), Icmesuyu & Kanalizasyon Dairesi Baskanligi, Blok D, Kat no 4, Yucetepe, Ankara:

Prequalification. Carrying out package 7 of the Cumhuriyet water treatment works as part of the Greater Istanbul water supply second stage project - the Melen system. The works, to be carried out in the Beykoz and Tarabya region, 15 kilometres north of Istanbul, comprise the following tunnel works: 1) 982.8 metres of the Ortacesme tunnel; 2) 5,571.5 metres of the Bosporus tunnel; 3) 2,557.6 metres of Ayazaga tunnel; and 4) 137.3 metres of connections between tunnels. Financed by Japan's Overseas Economic Co-operation Fund.

Details, available until 4 December, on payment of TL 50 million, including VAT.

CD 11 December

A MEED Subscription...

Subscribe or upgrade your current MEED.com package to support your strategic planning with the MENA region’s best source of business information. Proceed to our online shop below to find out more about the features in each package.