Details of the tender may be obtained from State Hydraulics Works (Devlet Su Isleri Genel Mudurlugu - DSI), Icmesuyu & Kanalizasyon Dairesi Baskanligi, Blok D, Kat no 4, Yucetepe, Ankara:
Prequalification. Carrying out package 6 of the Cumhuriyet water treatment works as part of the Greater Istanbul water supply second stage project - the Melen system. The works, to be carried out between Sile and Kagithane, comprise the pipeline between the Cumhuriyet header tank and Osmankuyu- Kagithane as follows: 1) transportation of pipes from specified collection points; 2) pipe installation including all civil works such as trenching, bedding and backfilling; 3) supply, transport and installation of valves and other pipeline fittings; 4) construction of special pipeline structures, reinforced concrete valve chambers, and road and river crossings; 5) construction of tunnel portal structures; 6) construction of large-diameter water tunnels with reinforced concrete and steel linings; 7) construction of large-diameter buried reinforced concrete conduits; and 8) construction of pipeline service roads. Financed by Japan's Overseas Economic Co-operation Fund.
Details, available until 13 November, on payment of TL 50 million, including VAT.
CD 20 November
You might also like...
TotalEnergies to acquire remaining 50% SapuraOMV stake
26 April 2024
Hyundai E&C breaks ground on Jafurah gas project
26 April 2024
Abu Dhabi signs air taxi deals
26 April 2024
Spanish developer to invest in Saudi housing
26 April 2024
A MEED Subscription...
Subscribe or upgrade your current MEED.com package to support your strategic planning with the MENA region’s best source of business information. Proceed to our online shop below to find out more about the features in each package.