Contractor appointed for Mall of Oman

09 November 2016

Retail centre is due to open in 2020

Dubai-based Majid al-Futtaim (MAF) has appointed the local Sarooj Construction as the contractor for enabling and highways works for its Mall of Oman project on the outskirts of Muscat.

The works include bulk excavations, retaining walls, utility diversions followed by major road and bridge construction around interchange number 6 of the Muscat Expressway.

Work on the mall’s main construction contract is due in early 2017. MAF received bids from at least five groups for the estimated $715m contract in September. The bidders include:

  • · Consolidated Contractors Company (Lebanon)/Shapoorji Pallonji (India)
  • · Habtoor Leighton Group (UAE)/Galfar Engineering (local)
  • · Larsen & Toubro (India)
  • · Six Construction (Belgium)/Al-Turki (local)
  • · TAV (Turkey)

MAF has also received proposals from local and regional banks to lead a finance deal for the project. The financing is expected to include an Omani riyal tranche.

Scheduled to open in 2020, the mall will have 350 outlets with 137,000 square metres of retail space.

A MEED Subscription...

Subscribe or upgrade your current MEED.com package to support your strategic planning with the MENA region’s best source of business information. Proceed to our online shop below to find out more about the features in each package.